sort by | All Contracts | Aluminium | Bolted Glass Systems | Copper | Fire Screens | Glass Ballustrades | Glazing Systems | Kawneer Architectural Systems | Main Contractor Projects | Roofing & Leadwork | Sand Cast Lead | Slating & Tiling | Stainless Steel | Zinc
 

November 2008 - LEICESTER TIGERS GROUND REDEVELOPMENT
Division: Glazing Systems
Materials Used: Aluminium
Galliford Try

Phase 1 – Construction of the new 10,500-seater Caterpillar Stand on the north side of the stadium

October 2008 - THAMES TOWER, BURLEYS WAY, LEICESTER
Division: Glazing Systems
Materials Used: Kawneer Architectural Systems
Hallams

Major re-cladding & refurbishment of 1960’s 16 storey office block

July 2008 - BRITISH GAS CALL CENTRE, LEICESTER
Division: Glazing Systems
Materials Used: Kawneer Architectural Systems
Drewmark Building Services

Complete re-glazing of facade of operational call centre

November 2007 - THE SHOE FACTORY
Division: Glazing Systems
Materials Used: Kawneer Architectural Systems
Hallams

Major refurbishment of the original 1919 Hill & Cunningham shoe factory into 44 ‘loft’ apartments plus duplex penthouse is located by the side of the River Soar overlooking Abbey Park

September 2007 -
Division: Glazing Systems
Materials Used: Bolted Glass Systems, Aluminium
Main Contractor: Bovis Lend Lease

New £60 million arts centre by architect Rafael Vinoly. Our works include 110 metre long by 5 metre high curved glass facade under a 5 metre deep metal clad soffit

September 2007 - HIGHCROSS, LEICESTER (BALUSTRADES & BALCONIES)
Division: Glazing Systems
Materials Used: Glass Ballustrades, Stainless Steel
Main Contractor: Sir Robert McAlpine

£300 million mixed retail, leisure and residential development. Our works included main glazed balustrades package to both existing and new malls plus the glazed balustrades, ‘Juliet’ balconies and roof-lights package to the residential areas of the development

December 2006 - LACE MARKET SQUARE, NOTTINGHAM
Division: Glazing Systems
Materials Used: Kawneer Architectural Systems, Other Materials
Main Contractor: Marriott Construction

High class residential and retail development in the heart of Nottingham's famous lace market.

August 2006 - HIGHCROSS, LEICESTER. (SCENIC LIFTS)
Division: Glazing Systems
Materials Used: Bolted Glass Systems, Glass Ballustrades
Main Contractor: Sir Robert McAlpine

£300 million mixed retail, leisure and residential development. Our works included: scenic lifts, balustrading, entrance doors and public toilets

September 2005 - BURGHLEY HOUSE, STAMFORD,
Division: Glazing Systems
Materials Used: Bolted Glass Systems

The old Brew House of Burghley House has been adapted as the new Visitor Centre

August 2005 - VICARAGE MEAD, THAXTED, ESSEX
Division: Glazing Systems
Materials Used: Kawneer Architectural Systems

Refurbishment of sheltered accommodation complex in Thaxted Essex.


Next Last