Phase 1 – Construction of the new 10,500-seater Caterpillar Stand on the north side of the stadium
The main contract has been secured by Galliford Try with Norman & Underwood being awarded the subcontract for the specialist glazing package, which comprises of the design, manufacture and installation of Metal Technologies System 17 thermally broken curtain walling system and incorporates their System 10 non thermally broken commercial door to all entrances.
The glazing is to be a mixture of double and single glazing with ceramic look-a-like panels to disguise exposed block work.