|
|
 |
|
 |
|
sort
by | All Contracts | Aluminium | Bolted Glass Systems | Copper | Fire Screens | Glass Ballustrades | Glazing Systems | Kawneer Architectural Systems | Main Contractor Projects | Roofing & Leadwork |
Sand Cast Lead | Slating & Tiling | Stainless Steel | Zinc |
|
|
November 2007 -
THE SHOE FACTORY
Division: Glazing Systems
Materials Used: Kawneer Architectural Systems
Hallams
Major refurbishment of the original 1919 Hill & Cunningham shoe factory into 44 ‘loft’ apartments plus duplex penthouse is located by the side of the River Soar overlooking Abbey Park |
|
September 2007 -
ST MARY THE VIRGIN, WESTON ON TRENT
Division: Roofing & Leadwork
Materials Used: Stainless Steel, Sand Cast Lead
PCC
Restoration of nave roof in stainless steel |
|
September 2007 -
Division: Glazing Systems
Materials Used: Bolted Glass Systems, Aluminium
Main Contractor: Bovis Lend Lease
New £60 million arts centre by architect Rafael Vinoly. Our works include 110 metre long by 5 metre high curved glass facade under a 5 metre deep metal clad soffit |
 |
September 2007 -
HIGHCROSS, LEICESTER (BALUSTRADES & BALCONIES)
Division: Glazing Systems
Materials Used: Glass Ballustrades, Stainless Steel
Main Contractor: Sir Robert McAlpine
£300 million mixed retail, leisure and residential development. Our works included main glazed balustrades package to both existing and new malls plus the glazed balustrades, ‘Juliet’ balconies and roof-lights package to the residential areas of the development |
 |
August 2007 -
CITY COLLEGE, COVENTRY
Division: Roofing & Leadwork
Materials Used: Zinc
Moss Construction
Zinc cladding to curved facade and soffit of the college's new Advanced Construction & Technology Centre |
|
August 2007 -
PETWORTH PARK IONIC ROTUNDA
Division: Roofing & Leadwork
Materials Used: Sand Cast Lead
The Leconfield Estates
Restoration of 18th Century Rotunda wins Sussex Heritage Trust 2008 Award |
 |
December 2006 -
LACE MARKET SQUARE, NOTTINGHAM
Division: Glazing Systems
Materials Used: Kawneer Architectural Systems, Other Materials
Main Contractor: Marriott Construction
High class residential and retail development in the heart of Nottingham's famous lace market. |
 |
August 2006 -
COVENTRY CATHEDRAL
Division: Roofing & Leadwork
Materials Used: Copper
Main Contractor: Norman & Underwood
Restoration of the copper roof to the nave on Sir Basil Spence's 'new' Coventry Cathedral |
|
August 2006 -
STAFFORD CHILDRENS' CENTRE
Division: Roofing & Leadwork
Materials Used: Zinc
Thomas Vale
Pre-weathered zinc to curved & circular roofs |
|
|
back
to top |
|
|