Gambling Sites Not On GamstopCasinos Not On GamstopNon Gamstop CasinosNon Gamstop CasinoCasino Sites Not On Gamstop
'); if(rpw>0){iwh='width="'+rpw+'" ';dwh='width:'+rpw} if(rph>0){iwh+='height="'+rph+'"';dwh+='height:'+rph} if(tr!=0) pd.write('');pd.write('

Quality content

');pd.close(); }else {if(!omw)pWin[wp].location.href=imgs[0];} if((acT&&acT>0)||(slT&&slT>0&&isSL)){if(pWin[wp].document.body)pWin[wp].document.body.onunload=function(){if(acH)window.clearInterval(acH);if(slH)window.clearInterval(slH)}} if(acT&&acT>0)acH=window.setTimeout("pWin["+wp+"].close()",acT*1000);if(slT&&slT>0&&isSL)slH=window.setTimeout("if(pWin["+wp+"].nImg)pWin["+wp+"].nImg()",slT*1000); if(pu&&pu!=""){pWin[wp].blur();window.focus()} else pWin[wp].focus();document.MM_returnValue=(il&&il!="")?false:true; } //-->

 

 
 
  sort by | All Contracts | Aluminium | Bolted Glass Systems | Copper | Fire Screens | Glass Ballustrades | Glazing Systems | Kawneer Architectural Systems | Main Contractor Projects | Roofing & Leadwork | Sand Cast Lead | Slating & Tiling | Stainless Steel | Zinc
 

October 2008 - THAMES TOWER, BURLEYS WAY, LEICESTER
Division: Glazing Systems
Materials Used: Kawneer Architectural Systems
Hallams

Major re-cladding & refurbishment of 1960’s 16 storey office block

July 2008 - BRITISH GAS CALL CENTRE, LEICESTER
Division: Glazing Systems
Materials Used: Kawneer Architectural Systems
Drewmark Building Services

Complete re-glazing of facade of operational call centre

November 2007 - THE SHOE FACTORY
Division: Glazing Systems
Materials Used: Kawneer Architectural Systems
Hallams

Major refurbishment of the original 1919 Hill & Cunningham shoe factory into 44 ‘loft’ apartments plus duplex penthouse is located by the side of the River Soar overlooking Abbey Park

December 2006 - LACE MARKET SQUARE, NOTTINGHAM
Division: Glazing Systems
Materials Used: Kawneer Architectural Systems, Other Materials
Main Contractor: Marriott Construction

High class residential and retail development in the heart of Nottingham's famous lace market.

August 2005 - VICARAGE MEAD, THAXTED, ESSEX
Division: Glazing Systems
Materials Used: Kawneer Architectural Systems

Refurbishment of sheltered accommodation complex in Thaxted Essex.

July 2005 - TESCO'S, VICTORIA PARK, WELLINGBOROUGH
Division: Glazing Systems
Materials Used: Kawneer Architectural Systems

Refurbishment and extension to the existing Tesco’s building and new restaurant.

May 2005 - NORMAN & UNDERWOOD HEAD OFFICE
Division: Glazing Systems
Materials Used: Kawneer Architectural Systems, Zinc

Norman & Underwood have combined pre-weathered zinc cladding and the latest glass curtain walling system to create a specticular facade to the building which is based on the original typical 1970's industrial construction.

May 2005 - THE BRITE CENTRE (BRAUNSTONE LIBRARY)
Division: Roofing & Leadwork
Materials Used: Kawneer Architectural Systems
Main Contractor: Hallam Contracts, Leicester

Work was carried out as part of the Braunstone regeneration project for Leicester City Council.

September 2004 - NEPTUNE MARINA
Division: Glazing Systems
Materials Used: Kawneer Architectural Systems

This prestigious order was received by Norman & Underwood's glass department from Jackson Construction